Bitcoin mining map

Where are the largest Bitcoin mines?

The 27 largest campuses mining Bitcoin today, in 8 countries: 5,170 MW of capacity in total.

Mine locations are approximate (the area of the town), and the MW capacity may differ from the actual figure. Some companies do not publish reports or they are hard to find, and many mines (e.g. in Dubai, Oman or Russia) do not disclose their capacity at all, so it cannot be reliably confirmed. We only show what we were able to verify. As of November 2026.

  • mining Bitcoin
  • bar height = capacity in MW
  • glow = countries with significant mining

Show on the globe

Drag to rotate · click a bar

Largest Bitcoin mines: list

#CampusOperatorLocationCapacityAs of
1Rockdale (Whinstone)

One of the largest mining campuses in the world, about 700 MW (capacity of the whole campus).

Riot PlatformsRockdale, Texas700 MWNovember 2026source
2Rockdale

563 MW in operation, another 179 MW planned.

BitdeerRockdale, Texas563 MWtarget 742 MWFebruary 2026source
3Jigmeling

The largest mining campus outside the USA, running entirely on hydropower from the Himalayas. Full 500 MW since September 2025.

Bitdeer with Druk HoldingJigmeling, Bhutan500 MWNovember 2026source
4Corsicana

About 400 MW of mining on a campus with a grid connection of about 1 GW.

Riot PlatformsCorsicana, Texas400 MWNovember 2026source
5Granbury

About 300 MW, a campus owned by MARA.

MARAGranbury, Texas300 MWDecember 2025source
6King Mountain

Joint venture next to West Texas wind farms; miner colocation.

Hut 8 (50% stake)McCamey, Texas280 MWJuly 2026source
7Odessa

Campus in West Texas, about 207 MW.

CipherOdessa, Texas207 MWNovember 2026source
8Vega

205 MW, miners of the subsidiary American Bitcoin.

Hut 8 (American Bitcoin miners)Vega near Amarillo, Texas205 MWFebruary 2026source
9Masdar City

Joint venture with an Abu Dhabi sovereign fund; together with Mina Zayed 250 MW, energised since January 2024. No newer data for the site.

Zero Two with MARAMasdar City, Abu Dhabi200 MWJanuary 2024source
10Yguazú

The largest mine in South America, hydropower from Itaipu. A 100 MW expansion announced for Q3 2026 is not yet confirmed.

HIVE DigitalYguazú, Paraguay200 MWtarget 300 MWNovember 2026source
11Ellendale

Hosting of customer miners, fully utilised.

Applied Digital (hosting, incl. for MARA)Ellendale, North Dakota180 MWAugust 2026source
12Lake Mariner

About 145 MW of mining, hydro and nuclear power.

TeraWulfBarker, New York145 MWJune 2026source
13Garden City

132 MW in operation, possible expansion to 200 MW.

MARAGarden City, Texas132 MWtarget 200 MWNovember 2026source
14Jamestown

Hosting of customer miners, fully utilised.

Applied Digital (hosting)Jamestown, North Dakota106 MWAugust 2026source
15Kearney

About 92–100 MW; an adjacent 42 MW site was acquired in January 2026 (data inconsistent).

MARAKearney, Nebraska100 MWSeptember 2026source
16Gedu

The first large site in Bhutan (since 2023), hydropower.

Bitdeer with Druk HoldingGedu, Bhutan100 MWJuly 2026source
17Valenzuela

HIVE’s second campus in Paraguay (“Paraguay 2.0”), hydropower.

HIVE DigitalValenzuela, Paraguay100 MWAugust 2026source
18Bratsk

Next to the Bratsk hydroelectric plant. BitRiver’s parent company has been in bankruptcy proceedings since January 2026; current load unknown.

BitRiverBratsk, Irkutsk Oblast100 MWOctober 2026source
19Project Dorothy

About 98–100 MW of hosting next to wind farms.

Soluna (hosting)Silverton, Texas100 MWApril 2026source
20Sherbrooke

Three sites (96 MW) on hydropower; Keel has 170 MW across Quebec.

Keel (formerly Bitfarms)Sherbrooke, Quebec96 MWJuly 2026source
21Molde

Hydropower and a cool climate that lowers cooling costs.

BitdeerMolde, Norway84 MWAugust 2026source
22Christina Lake

75 MW approved (15 firm + 60 interruptible), hydropower.

DMG BlockchainChristina Lake, British Columbia75 MWMarch 2026source
23Medicine Hat

Gas-powered mining: electricity from the city’s gas power plant.

Hut 8 (American Bitcoin miners)Medicine Hat, Alberta67 MWMay 2026source
24Projeto Satoshi

The mine uses surplus power from the Alto Sertão III wind and solar farms that would otherwise be curtailed. The first large project in Brazil.

Renova EnergiaIgaporã, Bahia65 MWtarget 90 MWAugust 2026source
25Grand Falls

About 65–70 MW (data inconsistent), hydropower.

HIVE DigitalGrand Falls, New Brunswick65 MWNovember 2025source
26Mina Zayed

The second part of the Abu Dhabi joint venture (250 MW in total). No newer data for the site.

Zero Two with MARAMina Zayed, Abu Dhabi50 MWJanuary 2024source
27Alpha

50 MW next to the Niagara hydroelectric plant.

Hut 8 (American Bitcoin miners)Niagara Falls, New York50 MWMarch 2025source

Capacity in MW is the electrical power used for mining (or the campus capacity when the operator does not give a breakdown). We only show campuses that are mining Bitcoin today and have at least about 50 MW.

Important: locations are approximate (the centre of the town, not the exact site address), and MW figures come from company reports and databases as of the date shown. Many companies, especially private ones (e.g. in Dubai, Oman, Russia or Iran), do not publish reports or the capacity of their mines, so large sites may be missing from the map and the actual capacity and location may differ. Spotted a mistake? Write to us.

Countries with distributed mining

Thousands of smaller farms mine here, often without public data on individual sites. On the globe they appear as a glow over the country.

  • Russia: about 2.3–2.7 GW of mining, of which about 0.8 GW is legal; year-round bans in 13 regions and in Moscow Oblast.
  • Ethiopia: about 600 MW contracted with the state utility EEP (power mainly from the GERD dam); since September 2026 mines receive about 23% of their capacity because of drought, with no new allocations since 08.2025.
  • Paraguay: about 680–944 MW reserved with ANDE (estimates vary); contracts expire at the end of 2027.
  • Kazakhstan: about 70 licensed companies; since July 2026 a 300 MW quota for “strategic mining” from the Ekibastuz power plant.

Frequently asked questions

Where is the largest Bitcoin mine in the world?

The largest operating mining campuses are in Texas: Riot Platforms’ Rockdale (about 700 MW) and Bitdeer’s neighbouring Rockdale site (563 MW). The largest campus outside the USA is Jigmeling in Bhutan (500 MW, hydropower).

Which country mines the most Bitcoin?

According to industry estimates, the largest share of Bitcoin’s hashrate runs in the USA, followed by Russia and China. There are also large mining hubs in Paraguay, Oman, the United Arab Emirates, Canada and Ethiopia.

Why are mines built in Texas, Norway or Bhutan?

Cheap and stable electricity is what matters: in Texas wind, solar, gas and a flexible power market; in Norway, Paraguay and Bhutan hydropower. A cold climate also lowers cooling costs.

What does “MW” mean for a mine?

Megawatts are the electrical power a campus can draw. For example, 100 MW is roughly 30,000 miners drawing about 3.3 kW each. For comparison, a single miner at home draws 1–3.5 kW.

Is Bitcoin mining profitable in Poland?

At household electricity prices usually not, but with your own solar panels, heat recovery or hosting with cheap electricity it can be. Figures for every miner are on the Profitability page.

Want to mine cheaper than on household electricity? See which miner is profitable, or how to use surplus solar power (in Polish).