Where are the largest Bitcoin mines?
The 27 largest campuses mining Bitcoin today, in 8 countries: 5,170 MW of capacity in total.
Mine locations are approximate (the area of the town), and the MW capacity may differ from the actual figure. Some companies do not publish reports or they are hard to find, and many mines (e.g. in Dubai, Oman or Russia) do not disclose their capacity at all, so it cannot be reliably confirmed. We only show what we were able to verify. As of November 2026.
- mining Bitcoin
- bar height = capacity in MW
- glow = countries with significant mining
Show on the globe
Drag to rotate · click a bar
Largest Bitcoin mines: list
| # | Campus | Operator | Location | Capacity | As of |
|---|---|---|---|---|---|
| 1 | Rockdale (Whinstone) One of the largest mining campuses in the world, about 700 MW (capacity of the whole campus). | Riot Platforms | Rockdale, Texas | 700 MW | November 2026source |
| 2 | Rockdale 563 MW in operation, another 179 MW planned. | Bitdeer | Rockdale, Texas | 563 MWtarget 742 MW | February 2026source |
| 3 | Jigmeling The largest mining campus outside the USA, running entirely on hydropower from the Himalayas. Full 500 MW since September 2025. | Bitdeer with Druk Holding | Jigmeling, Bhutan | 500 MW | November 2026source |
| 4 | Corsicana About 400 MW of mining on a campus with a grid connection of about 1 GW. | Riot Platforms | Corsicana, Texas | 400 MW | November 2026source |
| 5 | Granbury About 300 MW, a campus owned by MARA. | MARA | Granbury, Texas | 300 MW | December 2025source |
| 6 | King Mountain Joint venture next to West Texas wind farms; miner colocation. | Hut 8 (50% stake) | McCamey, Texas | 280 MW | July 2026source |
| 7 | Odessa Campus in West Texas, about 207 MW. | Cipher | Odessa, Texas | 207 MW | November 2026source |
| 8 | Vega 205 MW, miners of the subsidiary American Bitcoin. | Hut 8 (American Bitcoin miners) | Vega near Amarillo, Texas | 205 MW | February 2026source |
| 9 | Masdar City Joint venture with an Abu Dhabi sovereign fund; together with Mina Zayed 250 MW, energised since January 2024. No newer data for the site. | Zero Two with MARA | Masdar City, Abu Dhabi | 200 MW | January 2024source |
| 10 | Yguazú The largest mine in South America, hydropower from Itaipu. A 100 MW expansion announced for Q3 2026 is not yet confirmed. | HIVE Digital | Yguazú, Paraguay | 200 MWtarget 300 MW | November 2026source |
| 11 | Ellendale Hosting of customer miners, fully utilised. | Applied Digital (hosting, incl. for MARA) | Ellendale, North Dakota | 180 MW | August 2026source |
| 12 | Lake Mariner About 145 MW of mining, hydro and nuclear power. | TeraWulf | Barker, New York | 145 MW | June 2026source |
| 13 | Garden City 132 MW in operation, possible expansion to 200 MW. | MARA | Garden City, Texas | 132 MWtarget 200 MW | November 2026source |
| 14 | Jamestown Hosting of customer miners, fully utilised. | Applied Digital (hosting) | Jamestown, North Dakota | 106 MW | August 2026source |
| 15 | Kearney About 92–100 MW; an adjacent 42 MW site was acquired in January 2026 (data inconsistent). | MARA | Kearney, Nebraska | 100 MW | September 2026source |
| 16 | Gedu The first large site in Bhutan (since 2023), hydropower. | Bitdeer with Druk Holding | Gedu, Bhutan | 100 MW | July 2026source |
| 17 | Valenzuela HIVE’s second campus in Paraguay (“Paraguay 2.0”), hydropower. | HIVE Digital | Valenzuela, Paraguay | 100 MW | August 2026source |
| 18 | Bratsk Next to the Bratsk hydroelectric plant. BitRiver’s parent company has been in bankruptcy proceedings since January 2026; current load unknown. | BitRiver | Bratsk, Irkutsk Oblast | 100 MW | October 2026source |
| 19 | Project Dorothy About 98–100 MW of hosting next to wind farms. | Soluna (hosting) | Silverton, Texas | 100 MW | April 2026source |
| 20 | Sherbrooke Three sites (96 MW) on hydropower; Keel has 170 MW across Quebec. | Keel (formerly Bitfarms) | Sherbrooke, Quebec | 96 MW | July 2026source |
| 21 | Molde Hydropower and a cool climate that lowers cooling costs. | Bitdeer | Molde, Norway | 84 MW | August 2026source |
| 22 | Christina Lake 75 MW approved (15 firm + 60 interruptible), hydropower. | DMG Blockchain | Christina Lake, British Columbia | 75 MW | March 2026source |
| 23 | Medicine Hat Gas-powered mining: electricity from the city’s gas power plant. | Hut 8 (American Bitcoin miners) | Medicine Hat, Alberta | 67 MW | May 2026source |
| 24 | Projeto Satoshi The mine uses surplus power from the Alto Sertão III wind and solar farms that would otherwise be curtailed. The first large project in Brazil. | Renova Energia | Igaporã, Bahia | 65 MWtarget 90 MW | August 2026source |
| 25 | Grand Falls About 65–70 MW (data inconsistent), hydropower. | HIVE Digital | Grand Falls, New Brunswick | 65 MW | November 2025source |
| 26 | Mina Zayed The second part of the Abu Dhabi joint venture (250 MW in total). No newer data for the site. | Zero Two with MARA | Mina Zayed, Abu Dhabi | 50 MW | January 2024source |
| 27 | Alpha 50 MW next to the Niagara hydroelectric plant. | Hut 8 (American Bitcoin miners) | Niagara Falls, New York | 50 MW | March 2025source |
Capacity in MW is the electrical power used for mining (or the campus capacity when the operator does not give a breakdown). We only show campuses that are mining Bitcoin today and have at least about 50 MW.
Important: locations are approximate (the centre of the town, not the exact site address), and MW figures come from company reports and databases as of the date shown. Many companies, especially private ones (e.g. in Dubai, Oman, Russia or Iran), do not publish reports or the capacity of their mines, so large sites may be missing from the map and the actual capacity and location may differ. Spotted a mistake? Write to us.
Countries with distributed mining
Thousands of smaller farms mine here, often without public data on individual sites. On the globe they appear as a glow over the country.
- Russia: about 2.3–2.7 GW of mining, of which about 0.8 GW is legal; year-round bans in 13 regions and in Moscow Oblast.
- Ethiopia: about 600 MW contracted with the state utility EEP (power mainly from the GERD dam); since September 2026 mines receive about 23% of their capacity because of drought, with no new allocations since 08.2025.
- Paraguay: about 680–944 MW reserved with ANDE (estimates vary); contracts expire at the end of 2027.
- Kazakhstan: about 70 licensed companies; since July 2026 a 300 MW quota for “strategic mining” from the Ekibastuz power plant.
Frequently asked questions
Where is the largest Bitcoin mine in the world?
The largest operating mining campuses are in Texas: Riot Platforms’ Rockdale (about 700 MW) and Bitdeer’s neighbouring Rockdale site (563 MW). The largest campus outside the USA is Jigmeling in Bhutan (500 MW, hydropower).
Which country mines the most Bitcoin?
According to industry estimates, the largest share of Bitcoin’s hashrate runs in the USA, followed by Russia and China. There are also large mining hubs in Paraguay, Oman, the United Arab Emirates, Canada and Ethiopia.
Why are mines built in Texas, Norway or Bhutan?
Cheap and stable electricity is what matters: in Texas wind, solar, gas and a flexible power market; in Norway, Paraguay and Bhutan hydropower. A cold climate also lowers cooling costs.
What does “MW” mean for a mine?
Megawatts are the electrical power a campus can draw. For example, 100 MW is roughly 30,000 miners drawing about 3.3 kW each. For comparison, a single miner at home draws 1–3.5 kW.
Is Bitcoin mining profitable in Poland?
At household electricity prices usually not, but with your own solar panels, heat recovery or hosting with cheap electricity it can be. Figures for every miner are on the Profitability page.
Want to mine cheaper than on household electricity? See which miner is profitable, or how to use surplus solar power (in Polish).